Henley

Client: Babcock

Let by: NG Bailey

Control Solutions: Tridium Niagara 4, ABB i-Bus

Scope of works: Detailed design, supply, installation, control and programming of lighting and BMS controls

Project Henley provided 6 floors of brand new office space for engineering and infrastructure management specialist Babcock.

IBT Controls were involved in the design, supply and installation of the integrated lighting and BMS package.

Supplying ABB i-Bus lighting control and Siemens Gamma HVAC controllers integrated onto a Schneider Ecostruxure BMS Front End and plant control solution.

The integrated solution ensures demand based energy usage throughout the building with ventilation and temperature control to spaces linked into occupancy states.