Another great win for IBT Controls

Following the successful delivery of the base build at the Brunel Building we are proud to announce we have secured the fit out of 3 floors for the prestigious client Premier League. Working with the main contractor Parkeray and their team of contractors Mala / Moynes of London, IBT shall be installing a Schneider EcoStructure BEMS solution integrating KNX for the lighting control and HVAC field devices.

The flexibility of KNX open protocol solutions has given the client a vast array of 500 manufacturers to choose from for the fields devices. The client has settled on a ABB Millenium range combined lighting scene plate and room thermostat for its main interface. The use of combined devices reduced the number of devices on a wall allowing cleaner lines and  streamlining the user experience.

 

More Articles

Previous Post:

Next Post:

Top